CCCC Fourth Harbor Engineering Co., Ltd. undertook the construction of the Hainan Yangpu Port International Container Terminal Project (Phase I and Phase II).

2026.02.05
I. Overall Project Positioning: The Gateway Port and Hub Port of the Hainan Free Trade Port
Strategic Significance: Yangpu Port is the deep-water port with the best water depth conditions and the largest throughput in Hainan. The construction of this container terminal directly serves the Overall Plan for the Construction of Hainan Free Trade Port, aiming to build it into:

Regional International Container Hub Port: Radiating Southeast Asia, connecting the Pacific and Indian Oceans.

International Shipping Hub of the Western Land-Sea New Corridor: Serving as the exit port of the new corridor, providing inland provinces with convenient and efficient access to the sea.

Pilot Window for Free Trade Port Policies: A carrier for implementing new policies such as exploring the China Yangpu Port flag state registration, bunker fuel supply, and transshipment consolidation.

II. Contractor: CCCC Fourth Harbor Engineering Co., Ltd.

Company Abbreviation: CCCC Fourth Harbor Bureau is a backbone enterprise with a long history and strong technical strength in South China, under the umbrella of China Communications Construction Company (CCCC).

Core Advantages: It enjoys domestic and international reputation particularly in fields such as large deep-water terminals, immersed tube tunnels, and cross-sea bridges, having undertaken numerous national super-large port projects.

Role Positioning: In the Yangpu Port project, CCCC Fourth Harbor Bureau serves as the general construction contractor, responsible for high-quality transformation of design blueprints into physical engineering works, acting as the main force in project construction.


Ⅲ. Project Phased Details

The project is constructed in phases, each with specific objectives and characteristics:

Phase I: Capacity Enhancement Project for the Xiaochantan Starting Terminal

Background: Upgrading, renovating, and expanding on the basis of the original Xiaochantan Terminal to rapidly increase the container throughput capacity of Yangpu Port and alleviate urgent initial shipping demands.
Significance: This serves as the "starting engine" for the construction of the Yangpu International Hub Port, laying the hardware foundation for subsequent development.


Phase II: Construction of a New Automated Container Terminal
This represents the core and essence of the project, embodying the highest level of technology currently available in global port construction.

Key Content and Highlights:

Fully Automated: Utilizing an advanced layout of single-gantry automated quay cranes, autonomous guided vehicles, and automated rail-mounted gantry cranes to achieve intelligent and unmanned operations across the entire process of terminal loading and unloading, horizontal transportation, and yard operations.

5G+ Smart Port: Deeply integrating technologies such as 5G, the Internet of Things (IoT), Beidou Navigation Satellite System, and artificial intelligence to establish a benchmark for smart ports that are intelligent, efficient, green, and safe.

High Design Standards: Constructing two 150,000-ton-class and one 200,000-ton-class (the largest globally) container berths, with a total quay length exceeding 1,400 meters and a designed annual throughput capacity of over 2.5 million standard containers.

Green and Eco-friendly: Widely applying shore power systems, photovoltaic power generation, and low-carbon equipment, while constructing ecological revetments, serving as a model for green ports.


IV. Current Progress

The first phase of the project has been completed and put into operation long ago, yielding remarkable results.

The second phase has been fully constructed and entered trial operation, marking that Yangpu Port has joined the ranks of a small number of automated terminals globally capable of berthing 200,000-ton container ships.

In summary, the Phase I and II projects of the Yangpu International Container Terminal, constructed by CCCC Fourth Harbor Engineering Company Ltd., constitute hard-core infrastructure for the construction of the Hainan Free Trade Port. It is not merely a super port engineering project, but also a comprehensive system integrating cutting-edge technology, green concepts, and national strategy, opening a brand-new maritime gateway for Hainan and even Southwest China to open up and cooperate with the world.


Previous :The project of Section SN5 of the Hub Project of the Western Land-Sea New Passage (Pinglu) Canal, undertaken by CCCC First Harbor Engineering Company Ltd.

Next:CCCC Second Harbor Engineering Company undertook the construction of Phase I wharf project of Zhoukou Central Port, Henan Communications Investment Group Port and Waterway Bureau