Engineering achievements
| Project Name | Number of Winning Bids | Winning Bid Amount | Construction Unit |
| New Western Land-Sea Corridor Pinglu Canal Maowei No. 1 Anchorage Project | 1000KN Bollards 552 Sets | 8270000 | CCCC First Harbor Engineering Company Ltd. |
| Pinglu Canal Project | 450KN 340 Sets | 2570000 | CCCC First Harbor Engineering Company Ltd. |
| Henan Zhoukou Central Port | 350KN 193 Sets | 1269000 | CCCC Second Harbor Engineering Company Ltd. |
| Hainan Yangpu Container Terminal | 2000KN 34 Sets, 450KN 20 Sets | 1081320 | CCCC Fourth Harbor Engineering Company Ltd. |
| Shenzhen Port Nanshan Area Mawan Operation Zone Terminal | 2000KN 17 Sets | 770000 | CCCC Fourth Harbor Engineering Company Ltd. |
| Hainan Hydraulic Engineering Project | 2000KN 43 Sets | 1591820 | Joint Venture of CCCC Fourth Harbor Engineering Company Ltd. and CCCC First Harbor Engineering Company Ltd. |
| Chongqing International Cruise Home Port | SA500H*1500L 1819 sets | 8700000 | CCCC 2nd Nav. Eng. Bureau |
| 650KN 129 sets, 750KN 76 sets | |||
| Navy Project 21400 | Light gray SA500H*2m 399 sets | 4230000 | China State Construction Harbor and Waterway Bureau Group |
| SA400H*2m 234t sets | |||
| 450KN bollard 37 sets | |||
| Berth No. 21, Sandu Bay Port Area, Fuzhou Port | 2250H two-drum one-plate 16 sets | 6642000 | CCCC 2nd Nav. Eng. Bureau |
| Shaoguan Port | 350KN 61 sets | 316000 | CCCC Fourth Harbor Engineering Co., Ltd. |
| Myanmar Thway Shipyard | 2000KN 4 sets, 1000KN 12 sets | 689000 | CCCC Fourth Harbor Engineering Co., Ltd. |
| 500KN double-column 4 sets, 550KN 12 sets | |||
| 350KN 28 sets | |||
| Huaihe River Mainstream Regulation Project | SA400*2.0m 286 sets | 1157000 | China Construction Port Group |
| 350KN 78 sets | |||
| Huangshi Port Phase II | 750KN 49 sets round bottom single eave cast iron | 321200 | China State Construction Port and Waterway Bureau |
| Huaiyin Huaihe Bin Gang Port Terminal Project | SA300、SA400 | 1895000 | China State Construction Port and Waterway Bureau Group |
| 906 sets | |||
| SA-400H*2m 1056 sets | |||
| Henan Zhoukou Port Terminal Logistics Park Phase I Project | 150KN 360 sets, 250KN 180 sets | 5004600 | China Construction Port Engineering Construction Group |
| CGN Lufeng Project | 650KN 30 sets, 750KN 30 sets | 528000 | CCCC Fourth Harbor Engineering Co., Ltd. |
| China Resources Cement Co., Ltd. | 550KN mooring bollards 119 sets | 1059100 | China Construction Port Engineering |
| China Resources Cement Limited | SA-A500*2000L | 1285900 | China Construction Port Engineering |
| 223 sets | |||
| Tianjin Port Asia-Europe International Intelligent Container Terminal | 2500KN cast steel mooring bollards | 1028160 | CCCC First Harbor Engineering Company Limited |
| Chongqing Longtou Port Phase II Engineering Project | 750KN mooring bollards 84 sets | 2666720 | Second Engineering Co., Ltd. of CCCC Second Harbor Engineering Company |
| SA600*1500H rubber fender 308 sets | |||
| Jiujiang Sand and Gravel Center Terminal Project | SA300*1500 392 sets | 2218068 | CCCC Second Harbor Engineering Company Limited Third Engineering Co., Ltd. |
| SA400*1500L 158 sets | |||
| SA500*1500L 305 sets | |||
| 1500KN 17 sets | |||
| Qingdao Wuchuan Heavy Industry | 2000KN double-headed 12 sets | 1283460 | Second Navigation Company No.1 |
| Xiamen Haicang Port | SUC1450 Two drums one board 21 sets SA-A400H 128 sets | 3182790 | CCCC Second Harbor Engineering Company Limited First Branch |
| SUC2000H double drum one plate anti-impact plate 17 pieces 1000KN 8 sets | 1364560 | Xiamen Port Dredging Engineering Co., Ltd. | |
| Xiamen Houshi Power Plant Coal Terminal | |||
| Changzhou China Resources Petroleum Storage Co., Ltd. | SA-B800H*1.5m32 sets | 764320 | CCCC Second Harbor Engineering Company Limited Third Branch |
| SA-B800*2m16 | |||
| Zhoushan Wanbang Yongyue Shipbuilding Co., Ltd. | SUC1250H two drums one plate 12 sets SA-A400H*2m87 sets SA-A300*1.5m68 sets 1500KN cast steel 12 sets | 1565490 | CCCC Second Harbor Engineering Company Limited First Branch |
| 750KN 7 sets | |||
| Zhoushan Pacific Chemical Co., Ltd. | SUC1150H two drums one board 11 sets SA-A600H*2m43 sets | 889673 | Shanghai Port Engineering Co., Ltd. |
| Jakarta, Indonesia Ryukyu Plant Dock | SUC1450H one drum one plate 12 sets | 1611524 | Hong Kong Ruiwei Engineering Co., Ltd. |
| Bali, Indonesia Power Plant Coal Dock | 1200 conical 24 sets GD280*1.5m 550KN 8 sets 650KN 7 sets | 1992400 | Shenzhen Changsheng Marine Engineering Co., Ltd. |
Table of Representative Engineering Achievements in Recent Years
| Henzhou Port Terminal Logistics Park Phase I Project | SA-400H*2m 1056 sets, 150KN 360 sets, 250KN 180 sets | 5004600 | China Construction Port Engineering Construction Group |
| China Resources Cement Co., Ltd. | 550KN mooring bollards 119 sets | 1059100 | CSCEC Zhongjian Port |
| China Resources Cement Co., Ltd. | SA-A500*2000L 223 sets | 1285900 | CSCEC Zhongjian Port |
| Tianjin Port Asia-Europe International Intelligent Container Terminal | 2500KN cast steel mooring bollards | 1028160 | CCCC First Harbor Engineering Company Limited |
| Chongqing Longtou Port Phase II Engineering Project | 750KN mooring bollards 84 sets | 2666720 | CCCC Second Harbor Engineering Company Second Engineering Co., Ltd. |
| SA600*1500H rubber fenders | |||
| 308 sets | |||
| Jiujiang Sand and Gravel Center Terminal Project | SA300*1500 392 sets | 2218068 | CCCC Second Harbor Engineering Company Third Engineering Co., Ltd. |
| SA400*1500L | |||
| 158 sets | |||
| SA500*1500L | |||
| 305 sets | |||
| Qingdao Wuchuan Heavy Industry | 1500KN 17 sets | ||
| 2000KN double-ended 12 sets | 1283460 | Second Harbor First Company | |
| Xiamen Haicang Port | SUC1450 two-drum one-plate 21 sets SA-A400H 128 sets | 3182790 | CCCC Second Harbor First Company |
| Zhangzhou Houshi Power Plant Coal Terminal | SUC2000H two-drum | 1364560 | Xiamen Port Dredging Engineering Co., Ltd. |
| one-plate fender plate 17 pieces | |||
| 1000KN 8 sets | |||
| Changzhou China Resources Petroleum Storage Co., Ltd. | SA-B800H*1.5m 32 sets | 764320 | CCCC Second Harbor Third Branch Company |
Historical project achievements
| CCCC First Harbor Engineering Company Limited, No.1 Engineering Co., Ltd., Tanggu | D300H × 1.5m 150KN | 204 Sets 28 Sets | |
| Jiangsu New Times Shipbuilding Co., Ltd. | DA-A500H ×2.625m | 138 Sets | One end straight |
| DA-A500H ×2.125m | 138 Sets | One end straight | |
| DA-A800H ×2.1m | 18 Sets | ||
| DA-A300H ×2.5m | 16 Sets | ||
| DA-A300H ×2.0m | 16 Sets | ||
| GD300H × 1.5m | 695 Sets | ||
| GD300H × 1.0m | 17 Sets | One end straight | |
| GD300H ×0.9m | 2Sets | One end straight | |
| Zhonghai Changxing International Ship Engineering Co., Ltd. | D300H × 1.0m | 30 Sets | |
| D300H ×2.0m | 10 Sets | ||
| Fujian Southeast Shipyard | GD300H × 1.5m | 4Sets | |
| GD300H × 1.0m | 13 Sets | ||
| 1700 ×730 × 100mm | 5Blocks | Rubber pad | |
| 1900 ×680 × 100mm | 4Blocks | Rubber pad | |
| CCCC First Harbor Engineering Company Limited, No.2 Engineering Co., Ltd. | DA-A500H × 1.0m | 141 Sets | |
| Gangway 200H ×2.7m | 3Sets | ||
| 550KN mooring bollard | 16 Sets | ||
| Shandong Offshore Port Construction Co., Ltd. | DA-A500H ×2.5m | 45 Sets | |
| Lianyungang Miaoling Phase III | SUC1600H( 1 × 1) | 56 Sets | |
| Zhuhai Kailong Investment Development Co., Ltd. | ΦType 1000H × 1.5m | 7Sets | |
| Guangzhou Zhizhiyuan Oil Industry Co., Ltd. | D300H × 1.5m | 4Sets | |
| DA-A400H ×2.0m | 4Sets | ||
| Gangway 200H ×2.1m | 1Sets | ||
| CCCC Third Harbor Engineering Company Quanzhou Shipyard Repair Area Phase I Project | DA-A600H × 1.5m | 24 Sets | |
| DA-A600H ×3.5m | 71 Sets | ||
| D2-120-40 | 1Sets | Double-column scrolling | |
| Navy East China Construction Bureau Xifanshi Wharf Project | DA-A400H ×2.0m | 34 Sets | |
| Gangway 400H ×2.2m | 4Sets | ||
| D300H ×2.0m | 34 Sets | ||
| CCCC Fourth Harbor Engineering Company No.2 Engineering Co., Ltd. Wenchong Shipyard | DA-A300H ×2.0m | 131 Sets | |
| D1-120-40 | 14 Sets | Single column scrolling |
